REMOVAL, DISPOSAL AND REPLACEMENT OF THE ASBESTOS CEMENT ROOFS OF THE WORKSHOP-WAREHOUSE AND GARAGE BUILDINGS AT THE HERA SPA HEADQUARTERS IN GRANAROLO DELL’EMILIA (BO)
Activities carried out by S.T.E.I. Studio Associato (by the associates Mr. M. Franceschini and Mr. P. Semproli, now partners and directors of Teleios Srl)
CLIENT: Hera S.p.A. – Holding Energia – Risorse Ambiente – V.le Carlo Berti Pichat 2/4, 40127 Bologna
INTERVENTION LOCATION: Via del Frullo 5, Granarolo dell’Emilia (BO)
SERVICES RENDERED: preliminary, definitive and executive project, obtaining of permits, D.L. and Safety coordination during design and execution phase.
AMOUNT OF WORKS: € 1.037.525
BEGINNING/END OF WORKS: 2008/2009
PROJECT DESCRIPTION
The intervention was carried out as part of the works concerning health and safety in the workplace undertaken by the company HERA S.p.a. inside its company headquarters in Granarolo dell’Emilia located in via Del Frullo; in particular, the work involved the removal, disposal and replacement of asbestos cement roofing in two sheds used respectively for vehicle shelter/washing and workshops.
The workshop shed has a modular shed roof with a total area of 7350 square meters.
The shelter and vehicle washing shed has a modular cusp cover with a total area of 10000 square meters.
Hera workshop shed
Hera shelter and vehicle washing shed
Protection parapet installation
Castle of ascent for the access in safety to the coverings